2016

Huidong Xiao Long Tan photovoltaic plant cumulative generating output exceeded 6000MW/H.

Kenya Meru Wind Power Project Pre-phase work finished.

2015

Huidong Xiao Long Tan 30MW Photovoltaic Plant synchronization.

Kenya Meru Wind Power Project started.

2014

Tiroda #4 Unit TOC was issued.

Tiroda 5*660MW coal fire plant handovered.

2013

Tiroda #2 Unit COD certificate was issued.

Tiroda #2 Unit COD certificate was issued

Kawai 2*660MW coal fire plant handovered.

2012
Synchronization of Tiroda Unit#1.
Accomplished Aluminum Smelter Project for Det.al.
Our last group of O&M personnel safely afrrived from Syria.
2011
Accomplished Munda 4x330MW Coal Based Thermal Power Project.
2010
Signed contract of Kawai 2X660MW Coal Based Thermal Power Project with Adani Group in India.
Signed contract of Tiroda Coal Based Thermal Power Project Phase II (2X660MW) with Adani Group in India.
2009
Signed the computer system upgrading and the technical reform contract with GOLD in Syria.
Synchronization of Mundra Unit#1.
2008
Subang Co-generating power plant put into operation.
Waylunik Co-generating power plant put into operation.
Signed contract of Tiroda Coal Based Thermal Power Project Phase I (3X660MW) with Adani Group in India.
Signed the 50MW Coal Based Thermal Power Project supply contract with AARTI STILL in India.
Ilham Heydar ogly Aliyev,the President of Aserbaijan, host a commencement ceremony of Aluminum Smelter Project.
2007
SCMEC bacame appointed EPC contractors of  a 33KV foundation grid reconstruction project at Mahe, Seychelles.
Signed EPC contract of Munda Coal Based Thermal Power Project Phase II (2X330MW) with Adani Group.
2006
Signed EPC contract of 100,000T/A Aluminum Smelter Project with Det.al.
Signed EPC contract of Munda Coal Based Thermal Power Project Phase I (2X330MW) with Adani Group.
2005
Accomplished 230kV Twin Bundle Transmission Line Project in Myanmar.
2004
Signed EPC contract of Waylunik Co-generating Power Plant and Subang Co-generating Power Plant with Sungai Budi Group.
2003
Accomplished Vietnam Coast Expansion Project.
2002
Accomplished Tishrin 105MWx6 Hydropower Station Project.
Renamed as SICHUAN MACHINERY & EQUIPMENT IMPORT & EXPORT CO.LTD.
2000
Accomplished Vietnam Reclamation project in Hiep Binh Chanh Commune, Thu Due District, Ho Chi Ming City.
1999
Signed contract for supplying equipment for construction of Project with Gia Dinh Construction Housing Trading Company, Vietnam.
Unit 1 of Tishrin (6X105MW) Hydropower Station Project COD.
1996
Accomplished Adiguzel (2X31MW) Hydropower Station in Turkey.
1993
Accomplished Serang (3X35MW) Co-generation Power Station in Indonesia.
Accomplished Mojokerto (2X35MW) Co-generation Power Station in Indonesia.
Accomplished 1500 Tons Power Cable Core Production Line in Thailand.
1992
Signed EPC contract of Tishrin (6X105MW) Hydropower Station Project with GOLD.
Accomplished Moulds Making Plant in U.S.A.
1990
Accomplished Isabella 6.639MVAx2 Hydropower Station in U.S.A.
Accomplished Dalles Dam 6.5MVA Hydropower Station in U.S.A.
1989
Accomplished Rio Bravo 7.82MVAx2 Hydropower Station in U.S.A.
1988
Renamed as SICHUAN MACHINERY & EQUIPMENT IMPORT & EXPORT CORPORATION.
1987
Accomplished Baligatan 6.675MVA Hydropower Station in Philippines.
1983
Accomplished 14 Hydropower stations with total 2,549KW capacity in PERU.
Accomplished Camanche 3.75MWx3 Hydropower Station in U.S.A.
Accomplished Camp Far West 7.55MVA Hydropower Station IN U.S.A.
1980
Renamed as CHINA MACHINERY & EQUIPMENT IMPORT & EXPORT CORPORATION SICHUAN BRANCH.
1978
CHINA MACHINERY & EQUIPMENT EXPORT CORPORATION SICHUAN BRANCH was established.